File #: RES 2018-019    Name: FDOT Joint Participation Agreement
Type: Resolution Status: Passed
File created: 12/20/2017 In control: City Commission
On agenda: 1/11/2018 Final action: 1/11/2018
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE A JOINT PARTICIPATION AGREEMENT (JPA) WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) THAT WILL PROVIDE FOR THE FDOT'S FUNDING TO THE CITY OF $250,000 FOR THE PURCHASE AND INSTALLATION OF SOLAR POWERED LED BIKE LANE DELINEATORS AT WINSTON PARK BOULEVARD BETWEEN LYONS ROAD AND STATE ROAD 7 (SR-7/US-441).
Indexes: FDOT, Joint Participation Agreement, Resolution
Attachments: 1. RESOLUTION 2018-019-Joint Participation Agreement, 2. AGREEMENT-Joint Participation Agreement, 3. BACKUP-Warranty Information (Revised), 4. BACKUP-Picture of Delineator
Related files: RES 2018-051
AGENDA ITEM REPORT
TITLE:
title
A RESOLUTION AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE A JOINT PARTICIPATION AGREEMENT (JPA) WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) THAT WILL PROVIDE FOR THE FDOT'S FUNDING TO THE CITY OF $250,000 FOR THE PURCHASE AND INSTALLATION OF SOLAR POWERED LED BIKE LANE DELINEATORS AT WINSTON PARK BOULEVARD BETWEEN LYONS ROAD AND STATE ROAD 7 (SR-7/US-441).
body
BACKGROUND:
The City is currently engaged in a construction agreement with Stanford Construction Co., for the Comprehensive Street Improvements-Phase I (CSI1) project that provides Right-of-Way (ROW) improvements of approximately 15 miles of City streets located between Sample Road and the Sawgrass Expressway. Work on this project began in July 2017 and is slated for completion approaching the mid-calendar year 2018.
The CSI1 improvements include milling and resurfacing, sidewalk construction, and application of the Broward County "Complete Streets" multi-modal transportation concept in roadway design, which adds bike lanes where possible. Accordingly, approximately two miles of "on-street" bike lanes have been proposed as part of CSI1, eastbound and westbound Winston Park Boulevard, between Lyons Road and SR-7/US-441.
Simultaneous with the CSI1 construction, the Florida Department of Transportation (FDOT) is undertaking a study to document the constructability and performance of solar powered LED delineators shown in Exhibit "A" of the attached Joint Participation Agreement (JPA) and also how it will affect ridership. The FDOT proposes to compensate the City up to $250,000 for applying the specified "test" delineators at the Winston Park Boulevard bike lane installation.
The City is in a position to potentially benefit from this timely FDOT agreement to provide a completely funded improvement that can be viably added to the scope of work of the currently active Comprehensive Street Improvement Project Phase I construction agreement.
DISCUSSION:
T...

Click here for full text