File #: RES 2019-288    Name: PSI Technologies, Inc. - Single Source Agreement
Type: Resolution Status: Passed
File created: 10/28/2019 In control: City Commission
On agenda: 12/12/2019 Final action: 12/12/2019
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE A SINGLE SOURCE AGREEMENT WITH PSI TECHNOLOGIES, INC. FOR THE CONTINUED PURCHASE OF WILO USA LLC PUMPS AND REPLACEMENT PARTS AS LONG AS SOLE DISTRIBUTORSHIP IS MAINTAINED.
Sponsors: Utilities and Engineering
Indexes: Resolution, Sole Source, Utilities and Engineering
Attachments: 1. RESOLUTION 2019-288-PSI Technologies, Inc. Single Source Agrmt, 2. AGREEMENT-PSI Technologies Single Source, 3. BACKUP-PSI Technologies Single Source Justification, 4. BACKUP-Wilo Warranty Information

AGENDA ITEM REPORT

TITLE:

title

A RESOLUTION AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE A SINGLE SOURCE AGREEMENT WITH PSI TECHNOLOGIES, INC. FOR THE CONTINUED PURCHASE OF WILO USA LLC PUMPS AND REPLACEMENT PARTS AS LONG AS SOLE DISTRIBUTORSHIP IS MAINTAINED.

   body

BACKGROUND:

For the past 20 years, the City has purchased Wilo USA LLC pumps to service most lift stations. This practice has created uniformity in maintenance, allowing reuse of parts and creating expertise of the products by field staff. Wilo USA LLC products are distributed by PSI Technologies, Inc. Throughout the years, the City has tried other pump manufacturers at select locations. The conclusion has been that Wilo USA LLC products are more robust and reliable.

DISCUSSION:

The Wastewater Pump Station Rehabilitation Program is part of the City Capital Improvement Program. The City has 57 lift stations.  Each lift station has two (2) or three (3) pumps, depending on the lift station’s design and capacity. The operation of lift stations is imperative to the wastewater collection system, and understanding the equipment operation and maintenance becomes vital. These pumps have a lifespan of 15 years +/-, and the City’s Utilities and Engineering staff perform continuous scheduled maintenance to ensure no failure. The manufacturer warranty for the pumps and replacement parts is attached for reference.

RECOMMENDATION:

Staff recommends approval of this resolution.

FISCAL IMPACT:

REVENUES:                                          $ 0

EXPENDITURES:                     Varies

BUDGETED?                                          Yes

NOTES:                     Account 4191535-6810, Wastewater Pump Station Rehabilitiation Program.