File #: RES 2018-207    Name: Willis Lease Site Plan
Type: Resolution Status: Passed
File created: 8/27/2018 In control: City Commission
On agenda: 9/27/2018 Final action: 9/27/2018
Title: A RESOLUTION APPROVING THE SITE PLAN REQUEST OF COCONUT CREEK AVIATION ASSETS, LLC TO CONSTRUCT A 24,300 +/- SQUARE FOOT WAREHOUSE/OFFICE BUILDING EXPANSION LOCATED AT 4700 LYONS TECHNOLOGY PARKWAY WITHIN THE LYONS CORPORATE PARK PLANNED COMMERCE DISTRICT (PCD). (QUASI-JUDICIAL)(PUBLIC HEARING)
Indexes: Planning and Zoning, Quasi Judicial, Resolution, Site Plan
Attachments: 1. RESOLUTION 2018-207-Willis Lease Site Plan, 2. MAP-Willis Lease Site Project Location, 3. BACKUP-Willis Lease Site Plan, 4. BACKUP-Willis Lease Site Public Participation Package, 5. MINUTES-2018-0808 PZ Mtg
Related files: 20-223, ORD 2021-002
AGENDA ITEM REPORT
TITLE:
title
A RESOLUTION APPROVING THE SITE PLAN REQUEST OF COCONUT CREEK AVIATION ASSETS, LLC TO CONSTRUCT A 24,300 +/- SQUARE FOOT WAREHOUSE/OFFICE BUILDING EXPANSION LOCATED AT 4700 LYONS TECHNOLOGY PARKWAY WITHIN THE LYONS CORPORATE PARK PLANNED COMMERCE DISTRICT (PCD). (QUASI-JUDICIAL)(PUBLIC HEARING)

body
BACKGROUND:
The subject property, approximately 3.75+/- acres in size, includes the last vacant building pad within the existing Lyons Corporate Park PCD. Originally approved by the Planning and Zoning Board on October 11, 2000, the warehouse/office building, approximately 24,300+/- square feet in size, was home to Tradewinds Aviation. A subsequent Planning and Zoning Board approval on January 12, 2005, provided a Phase 2 expansion that was never constructed. The property has since been acquired by Coconut Creek Aviation Assets, LLC.
DISCUSSION:
The applicant, Jerry Thomas T&T Design and Development, Inc. as agent on behalf of the owner, Gary Failler, Coconut Creek Aviation Assets, LLC (Willis Lease), is seeking site plan approval for a 24,300+/- square foot expansion to the existing warehouse/office building located at 4700 Lyons Technology Parkway within the Lyons Corporate Park PCD. If approved, the total new building area would be 48,600+/- square feet overall.

The expansion, located on the west side of the building, will provide additional warehouse space to the existing area. Parking, drive-aisles, and landscaping for both Phase 1 and 2 were completed during Phase 1 construction. The proposed expansion will maintain the architectural theme of the current building, and vehicular access and circulation will be maintained as it currently exists. A new sidewalk connection will be installed to further expand pedestrian circulation from Lyons Technology Parkway into the site.

Public Involvement:
As part of the application review process, the applicant was required to perform community outreach in an effort to provide project infor...

Click here for full text